Notes on the installation and commissioning of the impact crusher

Crushing equipment, including jaw crusher equipment, impact crusher , hammer crusher, today to talk about the problem of commissioning after crusher installation

1. The impact crusher rotor has been leveled at the factory, and the user generally does not need to perform balanced tests. When replacing the hammer and rotor components, a balanced configuration is required.
2. The main installation of the impact crusher should be balanced. The horizontal degree error of the main shaft is less than 1mm/m. The main driven wheel is in the same plane, and the belt is adjusted to be tight and the motor is fixed.
3. It is necessary to check whether the installation position of each component is moving, deforming, locking all bolts and checking whether the seal is available.
4. Check the wiring and fastening of the electrical box of the crusher, adjust the delay relay and overload protector, connect the circuit, test the motor steering, and select the fuse of the appropriate specification.
5. Check whether the hydraulic system of the impact crusher is reliable and has no leakage.

Frozen CPDTO Red Shrimp